PößneckWärme - closer than you think

Contrary to what the name "district or long distance heating" might suggest, our environmentally friendly and comfortable PößneckWärme is generated right here in Pößneck. In this way, it is nearby, but still far from your property. The heat is largely generated in highly efficient combined heat and power plants (CHP plants) using combined heat and power. Boiler plants supplement the generation of heat. Via our three district heating networks Pößneck-Ost, Pößneck-Mitte (Malzhaus) and Pößneck-Süd, the heat is piped directly to you as hot water. Via the house service line in your building, the supplied heat is transferred to the house system, where you can use it for heating and preparing hot water. Then, the cooled water flows back to our generation plants via the closed circuit and is heated again.

Prices and sample contracts

Our PößneckWärme PLUS 

With our standard delivery, you receive heat directly to your home connection. You pay a price based on your consumption.
 

payments Prices PößneckWärme PLUS

Download Download  Price information valid from 1.1.2025

Download Download  Price information valid until 31.12.2024


description price-regulation PößneckWärme PLUS

Download Download  Preisregelung gültig ab 1.1.2025

Download Download  Preisregelung valid until 31.12.2024


assignment Sample contract PößneckWärme PLUS

Download Download  Sample contract

Our Pößneck Wärmedienst PLUS 

With our Wärmedienst you get the "all-round carefree package". You don't have to worry about your installations in the building and only pay an agreed heat price.

payments Prices Pößneck Wärmedienst PLUS

Download Download  Price information valid from 1.1.2025

Download Download  Price information valid until 31.12.2024


description Price regulation Pößneck Wärmedienst PLUS

Download Download  Preisregelung gültig ab 1.1.2025

Download Download  Preisregelung valid until 31.12.2024


assignment Sample contract Pößneck Wärmedienst PLUS

Download Download  Sample contract

Important contract documents

No matter which product you choose from us. Here are the most important contractual components of your heat contract.
 

  Subscribe to remote heating

Download Download  Application form

Download Download  HAST design form


description Essential elements of the contract

Download Download Technical Terms and Conditions of Connection (TAB)

Download Download  FFVAV

Download Download  AVBFernwärmeV



Further information and documents can be found  here

Unsere Fernwärmeprodukte PößneckWärme und Pößneck Wärmedienst

 

    Wärmepreise          gült
District heating prices on the price sheet PößneckWärme

download Prices

download Prices

From January 1, 2025

until December 31, 2024

Price sheet PößneckWärme

download prices

download prices

From January 1, 2025

until December 31, 2024

Sample contracts  
PößneckWärme for private customers Download Download
PößneckWärme for commercial customers download Download

 

In addition to the standard delivery of district heating, we also offer you our heating service. This "all-round carefree package" eliminates the investment costs for you. You also do not have to worry about maintenance, repairs and troubleshooting. You simply pay an agreed heat price.

     Installation size smaller than 50 kW            gült
Prices Wärmedienst 

download Prices

download Prices
download Prices

From January 1, 2025 (VAT  19 %)

until 31.12.2024 (VAT  19 %)
until 31.12.2024 (VAT 7 %)

Price sheet Pößneck Wärmedienst

download prices

download prices

From January 1, 2025

until December 31, 2024

 

     Anlagengröße größer 50 kW            gült
Prices Wärmedienst 

download Prices

download Prices
download Prices

From January 1, 2025 (VAT  19 %)

until 31.12.2024 (VAT  19 %)
until 31.12.2024 (VAT 7 %)

Price sheet Pößneck Wärmedienst

download prices

download Prices

From January 1, 2025

until December 31, 2024

 

    Remote          valid until
Prices PößneckWärme download Prices December 31, 2022

 

Wärmedienst
System size smaller than 50 kW    
    
valid until
Prices Pößneck Wärmedienst download Prices December 31, 2022

 

    Wärmedienst
System size larger than 50 kW     
    


valid until

Prices Pößneck Wärmedienst download Prices

December 31, 2022

 

Our PößneckWärme in figures

 

  Fernwärme Pößneck
    Pößneck East Pößneck Mitte Pößneck Süd
Primary energy factor   0.300 1,300 0.720
Related to the energy mix
annual greenhouse gas emissions1)
(in relation to heat sales)
t CO2 / MWh
t CO2 / year
t GHG / year
0.121
935
1,165
0.244
491
588
0.152
447
536
percentage share
Renewable energies used
within the meaning of § 3 paragraph 2 GEG 2020

percent

0

0

0
Net losses 2)
Difference between heat grid feed-in
and the usable heat output

MWh / year

 

1,938
 

1) Calculation based on the operating years 2019 to 2021 | 2) Calculation based on the operating year 2024

More information on district heating in Pößneck

In order to bring district heating to the customers, a corresponding network is necessary. Anyone who has their porperty or house near the district heating network can, in principle, get district heating if required.

District heating in Pößneck is supplied in an environmentally friendly way via various combined heat and power plants (CHP). These plants work on a "small" scale according to the same principle of combined heat and power generation as plants in large CHP stations. CHP units are modular systems for generating electrical energy and heat. They consist of an engine, a synchronous generator and a heat exchanger. Diesel, vegetable oil or gas engines, but also gas turbines, fuel cells or stirling engines can be used to drive the generator. CHP plants have a higher overall efficieny compared to the conventional combination of local heating and a central power plant. This is due to the fact that the waste heat from electricity generation can be used directly on-site. The efficiency of electricity generation is between 25 and 38 %, depending on the size of the plant. If the waste heat is used completely and locally, an overall efficiency of 80 to 90 % can be achieved with regard to the primary energy used.

CHP modules usually have an electrical output of between one kW and several tens of MW.

Together with ASI Anlagen Service, Instandhaltung, an enterprise for facility service and maintenance, the Stadtwerke Energie offers a heating service for district heating systems with an output of more than 30 kW.

This means tha you do not have to pay the investment costs for the house connection station. The station will be operated by the facility management enterprise job, so you do not have to worry about maintenance work, repairs and fault rectification. For the entire service package, we contractually agree with you on a fixed price. The billing can either be done with the landlord or directly with the tenants - you decide.