Construction project
Modern living in Lobeda-Ost
With a long lead time and extensive preparations, the neighborhood at Salvador-Allende-Platz 9–23 is being renovated from the ground up. The 11-story buildings from 1982 and 1983 will undergo a thorough renovation. After the buildings have been vacated, all supply and disposal lines will be renewed down to the apartment level, including modern heating control. The aim is to create a new and modern place to live and retire for our tenants.
Space for families
The current 320 apartments will become 292 apartments subsidized by the Free State of Thüringen in the future. Some of the apartments will be combined into 6-room apartments, creating more space for families. 54 of the renovated apartments will be barrier-free. Some of the existing 1- and 3-room apartments will be retained.
Find your dream apartment
Living and residing in Lobeda
The neighbourhood Salvador-Allende-Platz 9–23 in the district Lobeda-East is very well located, and, within a radius of only one kilometer, you can find various shopping facilites, gastronomic offers, medical facilities and the University Hospital. Numerous playgrounds and the Drakendorf Park invite you to play, walk and relax. In addition, Lobeda offers different other parks, wonderful views of the Lobdeburg, the Leuchtenburg and the Kernberge.
At Salvador-Allende-Platz you live conveniently and close to nature. Thanks to the well-developed tram network, you can reach the center of Jena in about 30 minutes. Commuters will be pleased about the direct freeway connection.
Impressions
Facts and Figures
.
| Location | Salvador-Allende-Platz 9–23, 07747 Jena |
| Size of property | 9,062 m² |
| Residential units | After renovation: 292 apartments |
| Apartment types | 1- to 6-room apartments |
| Commercial units | 12 commercial units |
| Special features |
Barrier-free access and elevators Future tenants must be eligible for subsidised housing Partially wheelchair accessible bathroomss All apartments have balconies |
| Construction start | Expected mid-2023 |
| Completion | Expected 2027 |
| Planning | PHLOX Architekt & Ingenieur GmbH, Weimar |
Subsidised living
All flats in our neighbourhood are intended for prospective tenants with a certificate of eligibility for subsidised housing. This certificate enables to rent a flat in a state-subsidised housing if the household income is below a set limit.
Whether students, single parents, low-income families or pensioners - many people do not even know that they are eligible for a Wohnberechtigungsschein. You can find all the necessary information as well as a calculator to check your eligibility here: Certificate of eligibility for subsidised housing.
Location
The construction progress
Currently, the relocation of the existing tenants is planned, prepared and implemented step by step according to building entrances. Since all the water and sewage pipes are getting on in years and need to be replaced, the building will have to be emptied completely.
After the building is vacant, construction work will begin, including the new installation of the building services. The heat supply will continue to be provided by district heating. A modern heating control system creates individual savings opportunities. In addition, all water and sewage pipes will be replaced and renewed.
The process of new occupancy will be carried out one building entrance after the other. We will inform you as soon as the letting process has begun. Moreover, we will coordinate the detailed planning of the bathroom with the future tenants. We try to take special wishes into account
Construction process
Since all the water and sewage pipes are getting on in years, we are planning a so-called strand renovation. Only the replacement of all pipes will make it already unavoidable to completely empty all flats connected per staircase. Our staff will inform all tenants about the exact procedure and will be happy to give advice.
Once all flats are empty, the construction work will begin, including the new installation of the house technology. The heat supply will continue to be provided by district heating. A modern heating control system creates individual savings opportunities.
We coordinate the detailed planning of the bathroom with the future tenants and try to take special wishes into account.
Refurbishment
Renovation is better than building a new house, because an enormous amount of energy is needed when demolishing and constructing a new building. Thanks to modern building services and heating control, as well as a progressive energy concept, the refurbishment of the SAP is both sustainable and economical. Many improvements await future residents - from barrier-free access to a better indoor climate and more space for larger families.
Easy to access
With us, there live people of all ages. To guarantee all of them easy access to the buildings and apartmens, accessibility is one of the aspects we keep in mind during renovation. Thanks to new elevators, ramps and wide doors, people in wheelchairs or with walking aids as well as young families with buggies will soon be able to enter their flats without problems.
State funding
The refurbishment of our 11-storey buildings at Salvador-Allende-Platz is financially supported by the state of Thuringia with a loan of around 32 million euros. The notice of approval also includes a subsidy of around 5 million for accessibility and ensures affordable housing at the location for the next 20 years.

Building entrances and elevators
With ramps and elevators, we create barrier free access to all flats.

Heating control
In future, a modern control system for the environmentally friendly district heating will ensure energy savings.

Apartment sizes and layouts
We create more space for families by joining some smaller apartments.

Building technology and electrics
Up-to-date technology and new electrical wiring ensure comfort and safety.

Bathrooms and strands
New pipes and lines will be laid in the whole neighbourhood and modern bathrooms will be installed.

Floors and doors
All flats will receive modern, easy-care flooring and new doors.

Entrances and elevators
We create barrier-free access to all flats with ramps and elevators.

Neighbourhood and mobility
Protected parking areas for bicycles and e-scooters will be created near the entrances.
Service-Centre Lobeda
Matthias-Domaschk-Straße 1, 07747 Jena
Mail lobeda@
You can find both phone number and e-mail address of your personal tenant advisor in your personal tenancy-folder.
Social management jenawohnen
Löbdergraben 19, 07743 Jena
Phone 03641 884-449
Mail soziales@
Are you interested in one of our refurbished flats at Salvador-Allende-Platz?
The flats are not yet available for rent. However, we will be happy to help you find another flat in Jena or inform you when refurbished flats at Salvador-Allende-Platz are available..
Phone 03641 884-400
Mail vermietung@
We are there for you!
Are you a tenant at Salvador-Allende-Platz and have questions or queries regarding the renovation work?
Please do not hesitate to contact your tenancy advisor at the Service-Centre Lobed,a or ask your Social Management for help. We are happy to be there for you!